Technical parameters:
1。Design standards for indoor and outdoor platforms, stairs and ramp sandsrn
2。Platform guardrail height (flat distance from the ground on the armrest): 900mm-1200mm;
3。The vertical spacing of the guardrail column is 1200mm, and the vertical spacing of the glass guardrail column is 1000mm;
4。The vertical spacing of the guardrail pole is 110mm;
5。The balance spacing between the armrest and the upper crossbar is 110mm, and the lower crossbar is 110mm from the ground balance;
6。Requirements for the pipe wall: armrests, columns 1.4mm;
7。Profile finish: the use of Aksu outdoor powder high temperature electrostatic powder spray or oxidation electrophoresis coloring production process, color according to engineering design;
8。Production process: the use of classical buckle fast combination of production process, no welding, wire and corner code connection;
9。Glass guardrail technical requirements: the use of tempered clamp ingress safety glass, thickness of 12mm, embedded depth of 12mm, glass four sides using three-yuan etymcobar set;
10。Construction installation technical requirements: handrails and wall facades are fixed with aluminum die casting slots, and columns and floors are fixed with aluminum connecting parts.
11。The guardrails are all loaded with 1000N/m;
12。Common specifications for pipesrn
Handrails:
100mm x 50mm x 1.2mm, 95mm x 45mm x 1.4mm, 80mm x 50mm x 1.2mm,
80mm x 40.5mm x 2.0mm, 70mm x 46.9mm x 1.2mm, 70mm x 46.9mm x 1.4mm,
80mm x 46.9mm x 1.4 mm, 69mm x 46.9mm x 1.2mm, 70mm x 40mm x 1.2 mm;
Column:
56.5mm x 56.5mm x 1.2mm, 60mm x 56.5mm x 1.2mm, 56.5mm x 45mm x 1.2mm,
49.5mm x 49.5mm x 1.5mm, 44mm x 37.5mm x 1.5 mm;
Bar:
44mm x 37.5mm x 1.5mm, 30mm x 26.9mm x 1.2mm;
Poles:
25mm x 24mm x 1.0 mm, 24mm x 20mm x 1.0 mm.
Range of adaptations:
Adapted to civil and industrial buildings indoor and outdoor stairs, balconies, floor-to-ceiling windows, automatic elevator openings, glass curtain wall guardrails and pick-up platforms, corridors, atrium running horse corridors, bridges, traffic road isolation, lakeside, riverbanks, upper roof guardrails and so on.