1.Wholly new designed outer appearance, which makes the tractor more beautiful.
2.Multi-purpose, It can be matched with more than a dozen pieces of farm tools(trailer, rotary tiller, trencher, seeder, harvester, etc.)
3. Large capacity fuel tank, which makes the tractor works longer.
4. Single balance, the tractor works more stable.
5. The specific fuel is low, the tractor works more economically.
6. Excellent start ability, easy to start.
7.Oil bath air-filter makes the tractor more suitable to the bad condition.
8.Support OEM customization
Engine | Engine type | / | Single cylinder, horizontal, water cooled,4 stroke |
ZR180NL,ZR190NL,ZR195NL | HP | 8, 10, 12, 15, 18 | |
Main parameter | Dimension(LxWxH) | mm | 2170x890x1150 |
Min Ground Distance | mm | 210 | |
Wheel Base | mm | 640--680 | |
Weight (8/10/12 hp) | kg | 260 kgs/ 280kgs /320kgs | |
Semi-axis | mm | 360 |
WEIFANG BINHAI GROUP WORK WIN CO.,LTD. is a leading manufacturer and provider of total integrated supply chain solutions. We offer the best agricultural equipments, garden equipments, and accessories.
Our main product lines: tractor series, agricultural cultivating machinery series,spraying series, harvesting machinery series, post-processing machinery series, casting and forgings series. Our farm implements could match with domestic tractor (FOTON, YTO), and foreign famous brand tractor (JOHN DEERE, NEW HOLLAND, KUBOTA etc.)
We have a multilingual team, and many big branch factories. A regional market presence-including southeast Asia, Indonesia, Russia, Spain, Chile, Brasil, Australia etc.
Group Work Win strives to build a long term relationships by providing our customers with continuous and reactive support. We aim to supply better quality products and after-sales service.
A1: We are a leading manufacturer and provider of total integrated supply chain solutions for agricultural machinery.
Q2: What is the MOQ?
A2: Normally the MOQ is one set. There are some exceptions to this requirement because of the type of machines.
Q3: What is the delivery time?
A3: 15-20 working days after payment.
Q4: About the package?
A4: Iron frame or wooden box.